akak-oai ed9becd2fc Report why turn critical path capture is incomplete (#62357)
## Why

The `incomplete` status alone gives no indication of which timing dependency was missing or which operation prevented capture.

## What changed

Emit deduplicated `critical_path_incomplete_reasons` in turn analytics for incomplete captures. Reasons cover unsupported Code Mode and agent operations, unattributed reviews and user waits, missing turn starts, and forced teardown, with an `unclassified` fallback. External tools that share a built-in name can still invalidate capture without being classified as the built-in operation.

During interruption, use the task's join result to distinguish forced teardown from normal completion so a task that already finished can still report a complete path.

## Testing

Add coverage for analytics serialization, concurrent reason deduplication, tool name collisions, and interrupted tasks that finish normally or require forced teardown.

GitOrigin-RevId: fab9aa1ff881997a34dcf75adc5638133cedc7fe
2026-11-18 20:29:59 +00:00

104 lines
3.9 KiB
Rust

//! Turn critical-path facts and their nullable analytics fields.
//! Missing capture never becomes a zero-duration measurement.
use serde::Serialize;
/// Reasons a turn's critical path could not be measured.
#[derive(Clone, Copy, Debug, PartialEq, Eq, Serialize)]
#[serde(rename_all = "snake_case")]
pub enum IncompleteReason {
CodeModeUnsupported,
UnsupportedOperation,
MissingTurnStart,
UnattributedReview,
UnattributedUserWait,
ForcedTeardown,
Unclassified,
}
/// Capture coverage for one finalized turn, independent of its completion status.
#[derive(Clone, Debug, Default, PartialEq, Eq, Serialize)]
pub enum TurnCriticalPath {
#[default]
Disabled,
Incomplete(Vec<IncompleteReason>),
Complete(TurnCriticalPathDurations),
}
impl TurnCriticalPath {
pub fn status(&self) -> &'static str {
match self {
Self::Disabled => "disabled",
Self::Incomplete(_) => "incomplete",
Self::Complete(_) => "complete",
}
}
pub fn durations(&self) -> Option<&TurnCriticalPathDurations> {
match self {
Self::Complete(durations) => Some(durations),
Self::Disabled | Self::Incomplete(_) => None,
}
}
}
/// Category totals over the server turn interval, truncated to milliseconds.
/// Inference is the compatibility total of sampling and compaction, not another leaf.
/// Independent truncation can leave the seven leaf categories up to six milliseconds
/// below duration_ms, and sampling_ms + compaction_ms up to one below inference_ms.
#[derive(Clone, Debug, PartialEq, Eq, Serialize)]
pub struct TurnCriticalPathDurations {
pub duration_ms: u64,
pub inference_ms: u64,
pub sampling_ms: u64,
pub compaction_ms: u64,
pub auto_review_ms: u64,
/// Portion of auto_review_ms outside observed Guardian turn execution; not additive.
pub auto_review_overhead_ms: Option<u64>,
pub user_wait_ms: u64,
pub tools_ms: u64,
pub overhead_ms: u64,
pub unknown_ms: u64,
}
#[derive(Serialize)]
pub(crate) struct CriticalPathEventParams {
critical_path_status: &'static str,
critical_path_duration_ms: Option<u64>,
critical_path_inference_ms: Option<u64>,
critical_path_sampling_ms: Option<u64>,
critical_path_compaction_ms: Option<u64>,
critical_path_auto_review_ms: Option<u64>,
critical_path_auto_review_overhead_ms: Option<u64>,
critical_path_user_wait_ms: Option<u64>,
critical_path_tools_ms: Option<u64>,
critical_path_overhead_ms: Option<u64>,
critical_path_unknown_ms: Option<u64>,
#[serde(skip_serializing_if = "Vec::is_empty")]
critical_path_incomplete_reasons: Vec<IncompleteReason>,
}
impl From<TurnCriticalPath> for CriticalPathEventParams {
fn from(path: TurnCriticalPath) -> Self {
let durations = path.durations();
Self {
critical_path_status: path.status(),
critical_path_duration_ms: durations.map(|value| value.duration_ms),
critical_path_inference_ms: durations.map(|value| value.inference_ms),
critical_path_sampling_ms: durations.map(|value| value.sampling_ms),
critical_path_compaction_ms: durations.map(|value| value.compaction_ms),
critical_path_auto_review_ms: durations.map(|value| value.auto_review_ms),
critical_path_auto_review_overhead_ms: durations
.and_then(|value| value.auto_review_overhead_ms),
critical_path_user_wait_ms: durations.map(|value| value.user_wait_ms),
critical_path_tools_ms: durations.map(|value| value.tools_ms),
critical_path_overhead_ms: durations.map(|value| value.overhead_ms),
critical_path_unknown_ms: durations.map(|value| value.unknown_ms),
critical_path_incomplete_reasons: match path {
TurnCriticalPath::Incomplete(reasons) => reasons,
TurnCriticalPath::Disabled | TurnCriticalPath::Complete(_) => Vec::new(),
},
}
}
}