Commit Graph
5 Commits
Author SHA1 Message Date
akak-oai ed9becd2fc Report why turn critical path capture is incomplete (#62357)
## Why

The `incomplete` status alone gives no indication of which timing dependency was missing or which operation prevented capture.

## What changed

Emit deduplicated `critical_path_incomplete_reasons` in turn analytics for incomplete captures. Reasons cover unsupported Code Mode and agent operations, unattributed reviews and user waits, missing turn starts, and forced teardown, with an `unclassified` fallback. External tools that share a built-in name can still invalidate capture without being classified as the built-in operation.

During interruption, use the task's join result to distinguish forced teardown from normal completion so a task that already finished can still report a complete path.

## Testing

Add coverage for analytics serialization, concurrent reason deduplication, tool name collisions, and interrupted tasks that finish normally or require forced teardown.

GitOrigin-RevId: fab9aa1ff881997a34dcf75adc5638133cedc7fe
2026-11-18 20:29:59 +00:00
taohong-oai db14d7508d Report auto-review overhead in turn critical-path analytics (#59260)
## What changed

Track Guardian compaction and review turn execution within each tool's auto-review interval, and expose `critical_path_auto_review_overhead_ms` in turn analytics. This measures the portion of `auto_review_ms` outside observed Guardian turn execution; it is a subset, not an additional duration.

Freeze review observations when the review or tool invocation ends. Report unknown overhead as `null`, including when denial reconsideration runs an unobserved follow-up turn.

## Testing

Add coverage for shared compaction and review observations, cached reviews, unfinished reviews, reused tool call IDs, and execution timing with child critical-path capture enabled or disabled. Extend analytics and app-server tests to check the new field.

GitOrigin-RevId: a63dec2a75571a3167c8c3f0c1d21e11e4a8d050
2026-11-03 23:49:01 +00:00
taohong-oai d5830f6fc6 Expand per-turn critical path capture and split inference timing (#59245)
## What changed

- Report sampling and compaction separately as `critical_path_sampling_ms` and `critical_path_compaction_ms`, retaining `critical_path_inference_ms` as their combined compatibility total.
- Enable critical path capture for subagent and Guardian turns when `CriticalPathTiming` is enabled, while continuing to exclude memory consolidation sessions.
- Preserve capture across incoming agent messages and support direct `spawn_agent` and `wait_agent` calls. Attribute these calls to the parent's tool time and keep child work on the child's own turn.

## Testing

Add runtime coverage for independent parent/child timing, incoming agent messages, Guardian turns, feature gating, and memory consolidation exclusion. Update phase accounting and analytics tests to cover the new fields and millisecond truncation.

GitOrigin-RevId: 09d4c0b853e817216bed173e4404d0d782de97ec
2026-11-03 22:29:33 +00:00
bkotsopoulos 66e3b5a02c Record turn critical path metrics and trace fields (#58980)
## What changed

- Add critical path capture status and duration fields to `codex.turn_profile` traces.
- Emit capture counts for complete and incomplete profiles, and total and component duration histograms for complete profiles, tagged by product SKU and reasoning effort. Record metrics once per turn timing state and skip disabled captures.
- Extend critical path histogram boundaries up to two hours to cover long turns.

## Testing

Add coverage for duplicate reporting, disabled and incomplete captures, product SKU normalization, trace fields, component durations, and extended histogram boundaries.

GitOrigin-RevId: 5b1af9255f1c4a376b61c81eb68c7a74b01ae9ae
2026-11-02 20:57:23 +00:00
taohong-oai 33b16a9306 Report turn critical-path timing in analytics (#57209)
## What changed

Include critical-path capture status and duration totals in `codex_turn_event`, with categories for inference, auto review, user wait, tools, overhead, and unknown time. Count sampling and compaction as inference.

Distinguish `disabled`, `incomplete`, and `complete` capture. Emit null durations for disabled or incomplete capture so missing measurements are not reported as zero. Freeze the completion timestamp so repeated terminal notifications preserve the original measurement window.

## Testing

Add core and analytics tests for capture status, duration reporting, rounding, and repeated completion. Add app-server integration coverage for completed and interrupted turns with default, enabled, and disabled capture.

GitOrigin-RevId: c6c867120ee563ac48584c2f4b12df23acbabe06
2026-10-26 19:35:31 +00:00