## What changed Add `codex-utils-critical-path` to track shared dependency paths and attribute time to inference, automatic review, user waits, tools, overhead, and unknown work. Parallel joins retain the later-finishing branch, preserving its full history without double-counting overlapping work. Clip attribution to the requested interval and count unrecorded gaps as overhead. Bound retained history by collapsing it into unknown work at the depth limit, with nonrecursive destruction and bounded debug output. ## Testing Add unit tests for parallel joins, nested dependencies, ties, user waits, interval clipping, overlapping segments, history exhaustion, and safe formatting and concurrent release on small stacks. GitOrigin-RevId: 2df7453162491d3ae97bf4bee942730c8a4d5e5c
182 lines
6.2 KiB
Rust
182 lines
6.2 KiB
Rust
//! Persistent dependency paths and exclusive attribution over the observed turn interval.
|
|
//! History is depth-limited; formatting and destruction never recurse through the chain.
|
|
|
|
use std::sync::Arc;
|
|
use std::time::Duration;
|
|
use std::time::Instant;
|
|
|
|
const MAX_PATH_DEPTH: usize = 16_384;
|
|
|
|
/// Category attributed to an observed segment of dependency work.
|
|
#[derive(Clone, Copy, Debug)]
|
|
pub enum WorkKind {
|
|
/// Model inference work on the selected dependency path.
|
|
Inference,
|
|
/// Automatic review work, such as reviewing a tool call before execution.
|
|
AutoReview,
|
|
/// Time awaiting a human answer or approval on the selected dependency path.
|
|
UserWait,
|
|
/// Tool execution work, including work after a dependency join resumes.
|
|
/// This is an aggregate category; tool-specific subtypes such as browser or
|
|
/// computer use are not represented by this calculator.
|
|
Tools,
|
|
/// Time within the observed turn interval not covered by a recorded work segment.
|
|
Overhead,
|
|
/// Work whose category is unavailable, including history collapsed at the depth limit.
|
|
Unknown,
|
|
}
|
|
|
|
/// An immutable observed dependency path. Forks share their prefix; a join
|
|
/// retains only the dependency that actually released the waiting operation.
|
|
/// Equality compares path identity rather than the contents of each segment.
|
|
#[derive(Clone, Default)]
|
|
pub struct CriticalPath(Option<Arc<Node>>);
|
|
|
|
impl std::fmt::Debug for CriticalPath {
|
|
fn fmt(&self, f: &mut std::fmt::Formatter<'_>) -> std::fmt::Result {
|
|
// Summarize the tail without traversing shared dependency history.
|
|
f.debug_struct("CriticalPath")
|
|
.field("depth", &self.0.as_ref().map_or(0, |node| node.depth))
|
|
.field("end", &self.end())
|
|
.finish()
|
|
}
|
|
}
|
|
|
|
impl PartialEq for CriticalPath {
|
|
fn eq(&self, other: &Self) -> bool {
|
|
match (&self.0, &other.0) {
|
|
(Some(left), Some(right)) => Arc::ptr_eq(left, right),
|
|
(None, None) => true,
|
|
(Some(_), None) | (None, Some(_)) => false,
|
|
}
|
|
}
|
|
}
|
|
|
|
impl Eq for CriticalPath {}
|
|
|
|
struct Node {
|
|
previous: CriticalPath,
|
|
kind: WorkKind,
|
|
start: Instant,
|
|
end: Instant,
|
|
origin: Instant,
|
|
depth: usize,
|
|
}
|
|
|
|
/// Exclusive time attributed to each category within the requested interval.
|
|
#[derive(Debug, Default, PartialEq, Eq)]
|
|
pub struct PathDurations {
|
|
pub inference: Duration,
|
|
pub auto_review: Duration,
|
|
pub user_wait: Duration,
|
|
pub tools: Duration,
|
|
pub overhead: Duration,
|
|
pub unknown: Duration,
|
|
}
|
|
|
|
impl PathDurations {
|
|
fn record(&mut self, kind: WorkKind, duration: Duration) {
|
|
let total = match kind {
|
|
WorkKind::Inference => &mut self.inference,
|
|
WorkKind::AutoReview => &mut self.auto_review,
|
|
WorkKind::UserWait => &mut self.user_wait,
|
|
WorkKind::Tools => &mut self.tools,
|
|
WorkKind::Overhead => &mut self.overhead,
|
|
WorkKind::Unknown => &mut self.unknown,
|
|
};
|
|
*total = total.saturating_add(duration);
|
|
}
|
|
}
|
|
|
|
impl CriticalPath {
|
|
/// End of the last recorded segment, or `None` for an empty path.
|
|
pub fn end(&self) -> Option<Instant> {
|
|
self.0.as_ref().map(|node| node.end)
|
|
}
|
|
|
|
/// Retain the later-finishing path, choosing `self` on a tie.
|
|
pub fn latest(self, other: Self) -> Self {
|
|
if other.end() > self.end() {
|
|
other
|
|
} else {
|
|
self
|
|
}
|
|
}
|
|
|
|
/// Append work after the existing path ends, clipping overlap and ignoring empty segments.
|
|
/// Exceeding the history limit collapses the retained interval into unknown work.
|
|
pub fn work(self, start: Instant, end: Instant, kind: WorkKind) -> Self {
|
|
let start = self.end().map_or(start, |previous| previous.max(start));
|
|
if start >= end {
|
|
return self;
|
|
}
|
|
let origin = self.0.as_ref().map_or(start, |node| node.origin);
|
|
let previous_depth = self.0.as_ref().map_or(0, |node| node.depth);
|
|
let depth = previous_depth + 1;
|
|
if depth > MAX_PATH_DEPTH {
|
|
return Self::default().work(origin, end, WorkKind::Unknown);
|
|
}
|
|
Self(Some(Arc::new(Node {
|
|
previous: self,
|
|
kind,
|
|
start,
|
|
end,
|
|
origin,
|
|
depth,
|
|
})))
|
|
}
|
|
|
|
/// Select the full branch that released this join, not just its exposed
|
|
/// waiting tail. Both branches carry their common causal prefix.
|
|
pub fn join(self, start: Instant, end: Instant, dependency: Self) -> Self {
|
|
let path = self.latest(dependency);
|
|
let resumed_at = path.end().unwrap_or(start).max(start);
|
|
path.work(resumed_at, end, WorkKind::Tools)
|
|
}
|
|
|
|
/// Attribute the requested interval exclusively, counting unrecorded gaps as overhead.
|
|
pub fn durations(&self, start: Instant, end: Instant) -> PathDurations {
|
|
let mut totals = PathDurations::default();
|
|
let mut path = self;
|
|
let mut end = end;
|
|
while let Some(node) = path.0.as_ref() {
|
|
if end <= start {
|
|
break;
|
|
}
|
|
let segment_end = end.min(node.end);
|
|
let segment_start = start.max(node.start);
|
|
if end > node.end {
|
|
totals.record(WorkKind::Overhead, end.duration_since(start.max(node.end)));
|
|
}
|
|
if segment_start < segment_end {
|
|
totals.record(node.kind, segment_end.duration_since(segment_start));
|
|
}
|
|
end = end.min(node.start);
|
|
path = &node.previous;
|
|
}
|
|
if start < end {
|
|
totals.record(WorkKind::Overhead, end.duration_since(start));
|
|
}
|
|
totals
|
|
}
|
|
}
|
|
|
|
// Long sequential turns must not recursively destroy one Arc per operation.
|
|
// into_inner consumes each reference atomically: concurrent releases cannot
|
|
// leave an Err(Arc) whose subsequent drop recursively destroys the next node.
|
|
impl Drop for Node {
|
|
fn drop(&mut self) {
|
|
let mut previous = self.previous.0.take();
|
|
while let Some(node) = previous {
|
|
let Some(mut node) = Arc::into_inner(node) else {
|
|
break;
|
|
};
|
|
previous = node.previous.0.take();
|
|
}
|
|
}
|
|
}
|
|
|
|
#[cfg(test)]
|
|
#[path = "critical_path_tests.rs"]
|
|
mod tests;
|