mirror of
https://github.com/openai/codex.git
synced 2026-11-29 00:00:54 +00:00
## What changed Add `codex-utils-critical-path` to track shared dependency paths and attribute time to inference, automatic review, user waits, tools, overhead, and unknown work. Parallel joins retain the later-finishing branch, preserving its full history without double-counting overlapping work. Clip attribution to the requested interval and count unrecorded gaps as overhead. Bound retained history by collapsing it into unknown work at the depth limit, with nonrecursive destruction and bounded debug output. ## Testing Add unit tests for parallel joins, nested dependencies, ties, user waits, interval clipping, overlapping segments, history exhaustion, and safe formatting and concurrent release on small stacks. GitOrigin-RevId: 2df7453162491d3ae97bf4bee942730c8a4d5e5c
7 lines
135 B
Python
7 lines
135 B
Python
load("//:defs.bzl", "codex_rust_crate")
|
|
|
|
codex_rust_crate(
|
|
name = "critical-path",
|
|
crate_name = "codex_utils_critical_path",
|
|
)
|