## What changed
- Report sampling and compaction separately as `critical_path_sampling_ms` and `critical_path_compaction_ms`, retaining `critical_path_inference_ms` as their combined compatibility total.
- Enable critical path capture for subagent and Guardian turns when `CriticalPathTiming` is enabled, while continuing to exclude memory consolidation sessions.
- Preserve capture across incoming agent messages and support direct `spawn_agent` and `wait_agent` calls. Attribute these calls to the parent's tool time and keep child work on the child's own turn.
## Testing
Add runtime coverage for independent parent/child timing, incoming agent messages, Guardian turns, feature gating, and memory consolidation exclusion. Update phase accounting and analytics tests to cover the new fields and millisecond truncation.
GitOrigin-RevId: 09d4c0b853e817216bed173e4404d0d782de97ec
## What changed
Add `codex-utils-critical-path` to track shared dependency paths and attribute time to inference, automatic review, user waits, tools, overhead, and unknown work. Parallel joins retain the later-finishing branch, preserving its full history without double-counting overlapping work.
Clip attribution to the requested interval and count unrecorded gaps as overhead. Bound retained history by collapsing it into unknown work at the depth limit, with nonrecursive destruction and bounded debug output.
## Testing
Add unit tests for parallel joins, nested dependencies, ties, user waits, interval clipping, overlapping segments, history exhaustion, and safe formatting and concurrent release on small stacks.
GitOrigin-RevId: 2df7453162491d3ae97bf4bee942730c8a4d5e5c