Commit Graph
3 Commits
Author SHA1 Message Date
taohong-oai db14d7508d Report auto-review overhead in turn critical-path analytics (#59260)
## What changed

Track Guardian compaction and review turn execution within each tool's auto-review interval, and expose `critical_path_auto_review_overhead_ms` in turn analytics. This measures the portion of `auto_review_ms` outside observed Guardian turn execution; it is a subset, not an additional duration.

Freeze review observations when the review or tool invocation ends. Report unknown overhead as `null`, including when denial reconsideration runs an unobserved follow-up turn.

## Testing

Add coverage for shared compaction and review observations, cached reviews, unfinished reviews, reused tool call IDs, and execution timing with child critical-path capture enabled or disabled. Extend analytics and app-server tests to check the new field.

GitOrigin-RevId: a63dec2a75571a3167c8c3f0c1d21e11e4a8d050
2026-11-03 23:49:01 +00:00
taohong-oai d5830f6fc6 Expand per-turn critical path capture and split inference timing (#59245)
## What changed

- Report sampling and compaction separately as `critical_path_sampling_ms` and `critical_path_compaction_ms`, retaining `critical_path_inference_ms` as their combined compatibility total.
- Enable critical path capture for subagent and Guardian turns when `CriticalPathTiming` is enabled, while continuing to exclude memory consolidation sessions.
- Preserve capture across incoming agent messages and support direct `spawn_agent` and `wait_agent` calls. Attribute these calls to the parent's tool time and keep child work on the child's own turn.

## Testing

Add runtime coverage for independent parent/child timing, incoming agent messages, Guardian turns, feature gating, and memory consolidation exclusion. Update phase accounting and analytics tests to cover the new fields and millisecond truncation.

GitOrigin-RevId: 09d4c0b853e817216bed173e4404d0d782de97ec
2026-11-03 22:29:33 +00:00
taohong-oai 33b16a9306 Report turn critical-path timing in analytics (#57209)
## What changed

Include critical-path capture status and duration totals in `codex_turn_event`, with categories for inference, auto review, user wait, tools, overhead, and unknown time. Count sampling and compaction as inference.

Distinguish `disabled`, `incomplete`, and `complete` capture. Emit null durations for disabled or incomplete capture so missing measurements are not reported as zero. Freeze the completion timestamp so repeated terminal notifications preserve the original measurement window.

## Testing

Add core and analytics tests for capture status, duration reporting, rounding, and repeated completion. Add app-server integration coverage for completed and interrupted turns with default, enabled, and disabled capture.

GitOrigin-RevId: c6c867120ee563ac48584c2f4b12df23acbabe06
2026-10-26 19:35:31 +00:00